Mojave, CA · commissioned 2016
Cedar Creek Solar
- AC capacity
- 25.2 MW
- DC capacity
- 34 MW
- DC/AC ratio
- 1.35
- PPA
- $45/MWh
- Hardware
- 8 inverters, 136 strings
Energy delivered
2.4 GWh
Jun 16 – 29, 2026
Performance index
86.5%
Actual ÷ expected while measured
Lost revenue
$16.8K
$16.8K recoverable
Clipped by inverters
46.5 MWh
A design choice (DC/AC ratio), not a fault
Wash or wait?
Based on the last 3 days (Jun 27 – 29, 2026) and the site's soiling station. A wash has to pay for itself before the next likely heavy rain or scheduled wash; type in a contractor's quote or your own window to change the answer.
Until the scheduled wash (every 60 days)
- Soiling station
- 83.3% clean, losing 0.34%/day
- Last heavy rain (≥ 6 mm)
- Apr 25 (65 days ago)
- Soiling since
- Jun 1
- Will rain help?
- Heavy rain is rare here in this season
- Soiling now
- $1,463/day
- Pays back in
- 33 days
- Net over 11 days
- −$45,970
- Verdict
- WaitKeep the wash in 11 days
Soiling is costing $1,463 a day and rising about $30 a day as dust keeps settling. Over the next 11 days a wash would recover only $17,730 of its $63,700 cost, and the scheduled wash in 11 days will clean the panels anyway.
Other things to check
- String offline: $58/day. Send a technician; the strings table below names which one.
Soiling and rain
What soiling cost each day, above what fell from the sky. Soiling that drops to zero after a heavy rain (6 mm or more) was washed off; soiling that carries on through one needs a crew.
Heavy rain (≥ 6 mm) Showers
Daily energy
This site's metered output against the physics model's expectation.
- Expected (physics model)
- Actual (metered)
Where the revenue went
Energy lost to each cause, priced at each site's PPA rate.
- Soiling
364 MWh
$16.4K - String offline
8.5 MWh
$384 - Inverter outage
0 kWh
$0 - CurtailmentNot recoverable
0 kWh
$0 - String degraded
0 kWh
$0
Underperforming strings
Below 93% of their siblings' output per kW, Jun 23 – 29, 2026.
| Inverter | String | Output vs siblings | Likely cause |
|---|---|---|---|
| Inverter 03 | String 04 | 1% | Offline (fuse or disconnect) |
Inverters
The hardware at this site.
| Inverter | AC rating | DC capacity | DC/AC | Strings |
|---|---|---|---|---|
| Inverter 01 | 3.2 MW | 4.2 MW | 1.35 | 17 |
| Inverter 02 | 3.2 MW | 4.2 MW | 1.35 | 17 |
| Inverter 03 | 3.2 MW | 4.2 MW | 1.35 | 17 |
| Inverter 04 | 3.2 MW | 4.2 MW | 1.35 | 17 |
| Inverter 05 | 3.2 MW | 4.2 MW | 1.35 | 17 |
| Inverter 06 | 3.2 MW | 4.2 MW | 1.35 | 17 |
| Inverter 07 | 3.2 MW | 4.2 MW | 1.35 | 17 |
| Inverter 08 | 3.2 MW | 4.2 MW | 1.35 | 17 |
Rendered from ClickHouse via GraphQL: 14 SQL queries reading 4.8M rows, 494 ms end to end (1419 ms of query time, some of it in parallel). How this works