Mojave, CA · commissioned 2016

Cedar Creek Solar

AC capacity
25.2 MW
DC capacity
34 MW
DC/AC ratio
1.35
PPA
$45/MWh
Hardware
8 inverters, 136 strings

Energy delivered

5.4 GWh

Jun 1 – 29, 2026

Performance index

89.1%

Actual ÷ expected while measured

Lost revenue

$26.9K

$26.9K recoverable

Clipped by inverters

172 MWh

A design choice (DC/AC ratio), not a fault

Wash or wait?

Based on the last 3 days (Jun 27 – 29, 2026) and the site's soiling station. A wash has to pay for itself before the next likely heavy rain or scheduled wash; type in a contractor's quote or your own window to change the answer.

$
days

Until the scheduled wash (every 60 days)

Soiling station
83.3% clean, losing 0.34%/day
Last heavy rain (≥ 6 mm)
Apr 25 (65 days ago)
Soiling since
Jun 1
Will rain help?
Heavy rain is rare here in this season
Soiling now
$1,463/day
Pays back in
33 days
Net over 11 days
−$45,970
Verdict
WaitKeep the wash in 11 days

Soiling is costing $1,463 a day and rising about $30 a day as dust keeps settling. Over the next 11 days a wash would recover only $17,730 of its $63,700 cost, and the scheduled wash in 11 days will clean the panels anyway.

Other things to check

  • String offline: $58/day. Send a technician; the strings table below names which one.

Soiling and rain

What soiling cost each day, above what fell from the sky. Soiling that drops to zero after a heavy rain (6 mm or more) was washed off; soiling that carries on through one needs a crew.

Daily energy

This site's metered output against the physics model's expectation.

  • Expected (physics model)
  • Actual (metered)
0100 MWh200 MWh300 MWhJun 1Jun 7Jun 12Jun 18Jun 23Jun 29

Where the revenue went

Energy lost to each cause, priced at each site's PPA rate.

  • Soiling

    590 MWh

    $26.5K
  • String offline

    8.5 MWh

    $384
  • Inverter outage

    0 kWh

    $0
  • CurtailmentNot recoverable

    0 kWh

    $0
  • String degraded

    0 kWh

    $0

Underperforming strings

Below 93% of their siblings' output per kW, Jun 23 – 29, 2026.

Underperforming strings
InverterStringOutput vs siblingsLikely cause
Inverter 03String 041%Offline (fuse or disconnect)

Inverters

The hardware at this site.

Inverters
InverterAC ratingDC capacityDC/ACStrings
Inverter 013.2 MW4.2 MW1.3517
Inverter 023.2 MW4.2 MW1.3517
Inverter 033.2 MW4.2 MW1.3517
Inverter 043.2 MW4.2 MW1.3517
Inverter 053.2 MW4.2 MW1.3517
Inverter 063.2 MW4.2 MW1.3517
Inverter 073.2 MW4.2 MW1.3517
Inverter 083.2 MW4.2 MW1.3517

Rendered from ClickHouse via GraphQL: 13 SQL queries reading 4.8M rows, 490 ms end to end (1113 ms of query time, some of it in parallel). How this works