Estevan, SK · commissioned 2016
Coyote Valley Solar
- AC capacity
- 28.8 MW
- DC capacity
- 33.3 MW
- DC/AC ratio
- 1.16
- PPA
- $57/MWh
- Hardware
- 8 inverters, 152 strings
Energy delivered
1.1 GWh
Jun 23 – 29, 2026
Performance index
85.8%
Actual ÷ expected while measured
Lost revenue
$4.3K
$4.3K recoverable
Clipped by inverters
394 kWh
A design choice (DC/AC ratio), not a fault
Wash or wait?
Based on the last 3 days (Jun 27 – 29, 2026) and the site's soiling station. A wash has to pay for itself before the next likely heavy rain or scheduled wash; type in a contractor's quote or your own window to change the answer.
Until the next likely heavy rain
- Soiling station
- 93.7% clean, losing 0.24%/day
- Last heavy rain (≥ 6 mm)
- Jun 29 (today)
- Soiling since
- Jun 5
- Will rain help?
- Heavy rain today: wait a day to see if it washed off
- Soiling now
- $434/day
- Pays back in
- 64 days
- Net over 1 day
- −$62,066
- Verdict
- Wait
Soiling is costing $434 a day, but a heavy rain fell today. Check tomorrow's station reading: if it's back near 100%, the rain did the job for free; if not, it won't wash off and a wash is worth pricing.
Other things to check
- String offline: $44/day. Send a technician; the strings table below names which one.
- Irradiance sensor: output is 8.1% below the model, but the soiling station says the panels are clean and no equipment fault explains it. Most likely the pyranometer reads high (dirty dome or drifting calibration), so nothing is actually lost; check it before booking a wash.
Soiling and rain
What soiling cost each day, above what fell from the sky. Soiling that drops to zero after a heavy rain (6 mm or more) was washed off; soiling that carries on through one needs a crew.
Heavy rain (≥ 6 mm) Showers
Daily energy
This site's metered output against the physics model's expectation.
- Expected (physics model)
- Actual (metered)
Where the revenue went
Energy lost to each cause, priced at each site's PPA rate.
- Soiling
68.1 MWh
$3.9K - String offline
7.8 MWh
$442 - Inverter outage
0 kWh
$0 - CurtailmentNot recoverable
0 kWh
$0 - String degraded
0 kWh
$0
Underperforming strings
Below 93% of their siblings' output per kW, Jun 23 – 29, 2026.
| Inverter | String | Output vs siblings | Likely cause |
|---|---|---|---|
| Inverter 05 | String 13 | 1% | Offline (fuse or disconnect) |
Inverters
The hardware at this site.
| Inverter | AC rating | DC capacity | DC/AC | Strings |
|---|---|---|---|---|
| Inverter 01 | 3.6 MW | 4.2 MW | 1.16 | 19 |
| Inverter 02 | 3.6 MW | 4.2 MW | 1.16 | 19 |
| Inverter 03 | 3.6 MW | 4.2 MW | 1.16 | 19 |
| Inverter 04 | 3.6 MW | 4.2 MW | 1.16 | 19 |
| Inverter 05 | 3.6 MW | 4.2 MW | 1.16 | 19 |
| Inverter 06 | 3.6 MW | 4.2 MW | 1.16 | 19 |
| Inverter 07 | 3.6 MW | 4.2 MW | 1.16 | 19 |
| Inverter 08 | 3.6 MW | 4.2 MW | 1.16 | 19 |
Rendered from ClickHouse via GraphQL: 14 SQL queries reading 4.9M rows, 508 ms end to end (1292 ms of query time, some of it in parallel). How this works