Portfolio piece

Estevan, SK · commissioned 2016

Coyote Valley Solar

AC capacity
28.8 MW
DC capacity
33.3 MW
DC/AC ratio
1.16
PPA
$57/MWh
Hardware
8 inverters, 152 strings

Energy delivered

4.3 GWh

Jun 1 – 29, 2026

Performance index

91.6%

Actual ÷ expected while measured

Lost revenue

$8.9K

$8.9K recoverable

Clipped by inverters

694 kWh

A design choice (DC/AC ratio), not a fault

Wash or wait?

Based on the last 3 days (Jun 27 – 29, 2026) and the site's soiling station. A wash has to pay for itself before the next likely heavy rain or scheduled wash; type in a contractor's quote or your own window to change the answer.

$
days

Until the next likely heavy rain

Soiling station
93.7% clean, losing 0.24%/day
Last heavy rain (≥ 6 mm)
Jun 29 (today)
Soiling since
Jun 5
Will rain help?
Heavy rain today: wait a day to see if it washed off
Soiling now
$434/day
Pays back in
64 days
Net over 1 day
−$62,066
Verdict
Wait

Soiling is costing $434 a day, but a heavy rain fell today. Check tomorrow's station reading: if it's back near 100%, the rain did the job for free; if not, it won't wash off and a wash is worth pricing.

Other things to check

  • String offline: $44/day. Send a technician; the strings table below names which one.
  • Irradiance sensor: output is 8.1% below the model, but the soiling station says the panels are clean and no equipment fault explains it. Most likely the pyranometer reads high (dirty dome or drifting calibration), so nothing is actually lost; check it before booking a wash.

Soiling and rain

What soiling cost each day, above what fell from the sky. Soiling that drops to zero after a heavy rain (6 mm or more) was washed off; soiling that carries on through one needs a crew.

Daily energy

This site's metered output against the physics model's expectation.

  • Expected (physics model)
  • Actual (metered)
0100 MWh200 MWh300 MWhJun 1Jun 7Jun 12Jun 18Jun 23Jun 29

Where the revenue went

Energy lost to each cause, priced at each site's PPA rate.

  • Soiling

    144 MWh

    $8.2K
  • String offline

    12.2 MWh

    $695
  • Inverter outage

    0 kWh

    $0
  • CurtailmentNot recoverable

    0 kWh

    $0
  • String degraded

    0 kWh

    $0

Underperforming strings

Below 93% of their siblings' output per kW, Jun 23 – 29, 2026.

Underperforming strings
InverterStringOutput vs siblingsLikely cause
Inverter 05String 131%Offline (fuse or disconnect)

Inverters

The hardware at this site.

Inverters
InverterAC ratingDC capacityDC/ACStrings
Inverter 013.6 MW4.2 MW1.1619
Inverter 023.6 MW4.2 MW1.1619
Inverter 033.6 MW4.2 MW1.1619
Inverter 043.6 MW4.2 MW1.1619
Inverter 053.6 MW4.2 MW1.1619
Inverter 063.6 MW4.2 MW1.1619
Inverter 073.6 MW4.2 MW1.1619
Inverter 083.6 MW4.2 MW1.1619

Rendered from ClickHouse via GraphQL: 13 SQL queries reading 4.9M rows, 580 ms end to end (1306 ms of query time, some of it in parallel). How this works