Sarnia, ON · commissioned 2018
Blue Mesa Solar
- AC capacity
- 43.2 MW
- DC capacity
- 55 MW
- DC/AC ratio
- 1.27
- PPA
- $77/MWh
- Hardware
- 12 inverters, 192 strings
Energy delivered
1.8 GWh
Jun 23 – 29, 2026
Performance index
100.0%
Actual ÷ expected while measured
Lost revenue
$84
$84 recoverable
Clipped by inverters
156 kWh
A design choice (DC/AC ratio), not a fault
Wash or wait?
Based on the last 3 days (Jun 27 – 29, 2026) and the site's soiling station. A wash has to pay for itself before the next likely heavy rain or scheduled wash; type in a contractor's quote or your own window to change the answer.
Until the next likely heavy rain
- Soiling station
- 99.9% clean
- Last heavy rain (≥ 6 mm)
- Jun 27 (2 days ago)
- Soiling since
- No soiling now
- Will rain help?
- Nothing to wash off
- Soiling now
- —
- Pays back in
- —
- Net over 6 days
- —
- Verdict
- Nothing to wash
No soiling above the noise floor in the last 3 days (Jun 27 – 29, 2026), so a wash wouldn't recover anything.
Other things to check
Nothing at Blue Mesa Solar above the noise floor.
Soiling and rain
What soiling cost each day, above what fell from the sky. Soiling that drops to zero after a heavy rain (6 mm or more) was washed off; soiling that carries on through one needs a crew.
Heavy rain (≥ 6 mm) Showers
Daily energy
This site's metered output against the physics model's expectation.
- Expected (physics model)
- Actual (metered)
Where the revenue went
Energy lost to each cause, priced at each site's PPA rate.
- Inverter outage
1.0 MWh
$78 - Soiling
77 kWh
$6 - CurtailmentNot recoverable
0 kWh
$0 - String offline
0 kWh
$0 - String degraded
0 kWh
$0
Underperforming strings
Below 93% of their siblings' output per kW, Jun 23 – 29, 2026.
No string is below 93% of its siblings in this window.
Inverters
The hardware at this site.
| Inverter | AC rating | DC capacity | DC/AC | Strings |
|---|---|---|---|---|
| Inverter 01 | 3.6 MW | 4.6 MW | 1.27 | 16 |
| Inverter 02 | 3.6 MW | 4.6 MW | 1.27 | 16 |
| Inverter 03 | 3.6 MW | 4.6 MW | 1.27 | 16 |
| Inverter 04 | 3.6 MW | 4.6 MW | 1.27 | 16 |
| Inverter 05 | 3.6 MW | 4.6 MW | 1.27 | 16 |
| Inverter 06 | 3.6 MW | 4.6 MW | 1.27 | 16 |
| Inverter 07 | 3.6 MW | 4.6 MW | 1.27 | 16 |
| Inverter 08 | 3.6 MW | 4.6 MW | 1.27 | 16 |
| Inverter 09 | 3.6 MW | 4.6 MW | 1.27 | 16 |
| Inverter 10 | 3.6 MW | 4.6 MW | 1.27 | 16 |
| Inverter 11 | 3.6 MW | 4.6 MW | 1.27 | 16 |
| Inverter 12 | 3.6 MW | 4.6 MW | 1.27 | 16 |
Rendered from ClickHouse via GraphQL: 12 SQL queries reading 5.3M rows, 404 ms end to end (1172 ms of query time, some of it in parallel). How this works