Pecos, TX · commissioned 2021
Blue Bluff Solar
- AC capacity
- 40 MW
- DC capacity
- 53 MW
- DC/AC ratio
- 1.32
- PPA
- $41/MWh
- Hardware
- 16 inverters, 352 strings
Energy delivered
8.3 GWh
Jun 1 – 29, 2026
Performance index
99.2%
Actual ÷ expected while measured
Lost revenue
$2.8K
$2.8K recoverable
Clipped by inverters
78.1 MWh
A design choice (DC/AC ratio), not a fault
Wash or wait?
Based on the last 3 days (Jun 27 – 29, 2026) and the site's soiling station. A wash has to pay for itself before the next likely heavy rain or scheduled wash; type in a contractor's quote or your own window to change the answer.
Until the scheduled wash (every 90 days)
- Soiling station
- 98.9% clean, losing 0.34%/day
- Last heavy rain (≥ 6 mm)
- Jun 12 (17 days ago)
- Soiling since
- Jun 27
- Will rain help?
- Next heavy rain likely within ~20 days
- Soiling now
- $80/day
- Pays back in
- 69 days
- Net over 2 days
- −$79,894
- Verdict
- WaitSkip the wash in 2 days: saves $69.9K
Soiling is costing $80 a day and rising about $46 a day as dust keeps settling. Over the next 2 days a wash would recover only $206 of its $80,100 cost. The scheduled wash in 2 days isn't worth it yet either: skipping it saves about $69,902.
Other things to check
Nothing at Blue Bluff Solar above the noise floor.
Soiling and rain
What soiling cost each day, above what fell from the sky. Soiling that drops to zero after a heavy rain (6 mm or more) was washed off; soiling that carries on through one needs a crew.
Heavy rain (≥ 6 mm) Showers
Daily energy
This site's metered output against the physics model's expectation.
- Expected (physics model)
- Actual (metered)
Where the revenue went
Energy lost to each cause, priced at each site's PPA rate.
- Inverter outage
49.2 MWh
$2.0K - String offline
13.1 MWh
$539 - Soiling
6.2 MWh
$255 - String degraded
743 kWh
$30 - CurtailmentNot recoverable
0 kWh
$0
Underperforming strings
Below 93% of their siblings' output per kW, Jun 23 – 29, 2026.
| Inverter | String | Output vs siblings | Likely cause |
|---|---|---|---|
| Inverter 07 | String 11 | 88% | Degraded |
Inverters
The hardware at this site.
| Inverter | AC rating | DC capacity | DC/AC | Strings |
|---|---|---|---|---|
| Inverter 01 | 2.5 MW | 3.3 MW | 1.32 | 22 |
| Inverter 02 | 2.5 MW | 3.3 MW | 1.32 | 22 |
| Inverter 03 | 2.5 MW | 3.3 MW | 1.32 | 22 |
| Inverter 04 | 2.5 MW | 3.3 MW | 1.32 | 22 |
| Inverter 05 | 2.5 MW | 3.3 MW | 1.32 | 22 |
| Inverter 06 | 2.5 MW | 3.3 MW | 1.32 | 22 |
| Inverter 07 | 2.5 MW | 3.3 MW | 1.32 | 22 |
| Inverter 08 | 2.5 MW | 3.3 MW | 1.32 | 22 |
| Inverter 09 | 2.5 MW | 3.3 MW | 1.32 | 22 |
| Inverter 10 | 2.5 MW | 3.3 MW | 1.32 | 22 |
| Inverter 11 | 2.5 MW | 3.3 MW | 1.32 | 22 |
| Inverter 12 | 2.5 MW | 3.3 MW | 1.32 | 22 |
| Inverter 13 | 2.5 MW | 3.3 MW | 1.32 | 22 |
| Inverter 14 | 2.5 MW | 3.3 MW | 1.32 | 22 |
| Inverter 15 | 2.5 MW | 3.3 MW | 1.32 | 22 |
| Inverter 16 | 2.5 MW | 3.3 MW | 1.32 | 22 |
Rendered from ClickHouse via GraphQL: 13 SQL queries reading 6.6M rows, 570 ms end to end (1254 ms of query time, some of it in parallel). How this works