Brooks, AB · commissioned 2022
Cedar Bluff Solar
- AC capacity
- 17.5 MW
- DC capacity
- 23.3 MW
- DC/AC ratio
- 1.33
- PPA
- $53/MWh
- Hardware
- 7 inverters, 168 strings
Energy delivered
849 MWh
Jun 23 – 29, 2026
Performance index
99.5%
Actual ÷ expected while measured
Lost revenue
$254
$254 recoverable
Clipped by inverters
2.0 MWh
A design choice (DC/AC ratio), not a fault
Wash or wait?
Based on the last 3 days (Jun 27 – 29, 2026) and the site's soiling station. A wash has to pay for itself before the next likely heavy rain or scheduled wash; type in a contractor's quote or your own window to change the answer.
Until the next likely heavy rain
- Soiling station
- 99.9% clean
- Last heavy rain (≥ 6 mm)
- Jun 25 (4 days ago)
- Soiling since
- No soiling now
- Will rain help?
- Nothing to wash off
- Soiling now
- —
- Pays back in
- —
- Net over 8 days
- —
- Verdict
- Nothing to wash
No soiling above the noise floor in the last 3 days (Jun 27 – 29, 2026), so a wash wouldn't recover anything.
Other things to check
- String offline: $41/day. Send a technician; the strings table below names which one.
Soiling and rain
What soiling cost each day, above what fell from the sky. Soiling that drops to zero after a heavy rain (6 mm or more) was washed off; soiling that carries on through one needs a crew.
Heavy rain (≥ 6 mm) Showers
Daily energy
This site's metered output against the physics model's expectation.
- Expected (physics model)
- Actual (metered)
Where the revenue went
Energy lost to each cause, priced at each site's PPA rate.
- String offline
4.8 MWh
$253 - Soiling
22 kWh
$1 - Inverter outage
0 kWh
$0 - CurtailmentNot recoverable
0 kWh
$0 - String degraded
0 kWh
$0
Underperforming strings
Below 93% of their siblings' output per kW, Jun 23 – 29, 2026.
| Inverter | String | Output vs siblings | Likely cause |
|---|---|---|---|
| Inverter 02 | String 14 | 0% | Offline (fuse or disconnect) |
Inverters
The hardware at this site.
| Inverter | AC rating | DC capacity | DC/AC | Strings |
|---|---|---|---|---|
| Inverter 01 | 2.5 MW | 3.3 MW | 1.33 | 24 |
| Inverter 02 | 2.5 MW | 3.3 MW | 1.33 | 24 |
| Inverter 03 | 2.5 MW | 3.3 MW | 1.33 | 24 |
| Inverter 04 | 2.5 MW | 3.3 MW | 1.33 | 24 |
| Inverter 05 | 2.5 MW | 3.3 MW | 1.33 | 24 |
| Inverter 06 | 2.5 MW | 3.3 MW | 1.33 | 24 |
| Inverter 07 | 2.5 MW | 3.3 MW | 1.33 | 24 |
Rendered from ClickHouse via GraphQL: 14 SQL queries reading 5.1M rows, 524 ms end to end (1290 ms of query time, some of it in parallel). How this works