Imperial Valley, CA · commissioned 2023
Iron Hollow Solar
- AC capacity
- 15 MW
- DC capacity
- 18.2 MW
- DC/AC ratio
- 1.21
- PPA
- $48/MWh
- Hardware
- 6 inverters, 102 strings
Energy delivered
1.4 GWh
Jun 16 – 29, 2026
Performance index
88.8%
Actual ÷ expected while measured
Lost revenue
$8.8K
$8.8K recoverable
Clipped by inverters
847 kWh
A design choice (DC/AC ratio), not a fault
Wash or wait?
Based on the last 3 days (Jun 27 – 29, 2026) and the site's soiling station. A wash has to pay for itself before the next likely heavy rain or scheduled wash; type in a contractor's quote or your own window to change the answer.
Until the scheduled wash (every 60 days)
- Soiling station
- 87.1% clean, losing 0.27%/day
- Last heavy rain (≥ 6 mm)
- None on record
- Soiling since
- Jun 1
- Will rain help?
- Heavy rain is rare here in this season
- Soiling now
- $667/day
- Pays back in
- 38 days
- Net over 13 days
- −$26,599
- Verdict
- WaitKeep the wash in 13 days
Soiling is costing $667 a day and rising about $16 a day as dust keeps settling. Over the next 13 days a wash would recover only $9,901 of its $36,500 cost, and the scheduled wash in 13 days will clean the panels anyway.
Other things to check
Nothing at Iron Hollow Solar above the noise floor.
Soiling and rain
What soiling cost each day, above what fell from the sky. Soiling that drops to zero after a heavy rain (6 mm or more) was washed off; soiling that carries on through one needs a crew.
Heavy rain (≥ 6 mm) Showers
Daily energy
This site's metered output against the physics model's expectation.
- Expected (physics model)
- Actual (metered)
Where the revenue went
Energy lost to each cause, priced at each site's PPA rate.
- Soiling
179 MWh
$8.6K - String degraded
3.4 MWh
$164 - Inverter outage
0 kWh
$0 - CurtailmentNot recoverable
0 kWh
$0 - String offline
0 kWh
$0
Underperforming strings
Below 93% of their siblings' output per kW, Jun 23 – 29, 2026.
| Inverter | String | Output vs siblings | Likely cause |
|---|---|---|---|
| Inverter 06 | String 04 | 84% | Degraded |
| Inverter 03 | String 14 | 84% | Degraded |
Inverters
The hardware at this site.
| Inverter | AC rating | DC capacity | DC/AC | Strings |
|---|---|---|---|---|
| Inverter 01 | 2.5 MW | 3 MW | 1.21 | 17 |
| Inverter 02 | 2.5 MW | 3 MW | 1.21 | 17 |
| Inverter 03 | 2.5 MW | 3 MW | 1.21 | 17 |
| Inverter 04 | 2.5 MW | 3 MW | 1.21 | 17 |
| Inverter 05 | 2.5 MW | 3 MW | 1.21 | 17 |
| Inverter 06 | 2.5 MW | 3 MW | 1.21 | 17 |
Rendered from ClickHouse via GraphQL: 14 SQL queries reading 4.5M rows, 482 ms end to end (1170 ms of query time, some of it in parallel). How this works